Unsupported browser

You are using an outdated browser. Please upgrade your browser to improve your experience.

Sign up for an Award

Participate with your entry in one of our professional or student awards.

Sign up for an award

Sign up for a Profile

Create your own profile and publish it in the iF WORLD DESIGN GUIDE.

Sign up for a profile

Learn more:

iF SOCIAL IMPACT PRIZE

Present your project for free and win your share of EUR 50,000 in prize money.

Publish your project

Biomethane Massa Finalese / Green Deal

Biomethane Massa Finalese
Biomethane Massa Finalese
Biomethane Massa Finalese

The Massa Finalese (MO) plant is one of the very first industrial plants in Italy where biomethane is obtained from organic waste and it is the first with direct injection of biomethane into the local distribution network. In October 2018, the new anaerobic digestion section was inaugurated. This section allows the biomethane produced from the organic waste fraction to be introduced into the local gas distribution network. On March 1st, 2019, the first cubic meter of produced biomethane was fed into the local distribution network. AIMAG now sends all the produced biomethane into the local distribution network.

Client / Manufacturer

AIMAG SPA

AIMAG SPA
MIRANDOLA, Italy

Design

AS RETIGAS SRL

AS RETIGAS SRL
MIRANDOLA, Italy